Construction

Up Box Art Construction Sea Trial Review by Martin E. Other Examples

 

Initial
Hull Prep
Linkage & Shafts
Driveline
Servos
Control Surfaces
Hatch
Options
Finishing

 

 
Initial Construction - Details on kit contents, options and what you need to build itClick to the intial construction page
Hull Prep - Details on preparing the hull and rudder.
Linkage and Shafts - details on making the rudder linkage and installing the stern tubes.
DriveLine - Details on installing the Duo drive gearbox
Servos - details on installing the servos.  It's not easy but standard size servos do fit!
Control Surfaces - details on setting up the rudder and dive planes.
Hatch - details on building the hatch
Options - Details on the depth controller, adding lights and finishing the hatch.
Finishing - Details on ballasting the boat and the final touches.
  
  Last Updated: 08/25/2008